MONTÉRÉGIE · MRC DE LA VALLÉE-DU-RICHELIEU

Stair railings and guards in Chambly

Chambly was largely built after 1990, and it is the railing, well before the flight, that shows the thirty years since. We build interior guards in hardwood, metal or tempered glass, fitted to the opening exactly as it was framed.

Measured, milled at our workshop, installed and finished by our own team

6–8 wks
TYPICAL LEAD TIME
4
INFILL OPTIONS
3
REGULATED VALUES
100%
MADE IN QUÉBEC
OUR RAILINGS AND GUARDS

Five railing families. One that fits your stairs.

Chambly was built mostly after 1990, and it is the railing, well before the flight, that shows the thirty years gone by. Here are the five ways to change it, all set out under our railings and guards.

METHOD

How it works, from the site visit to the install

Here the site visit is mostly about confirming what stays: the stringer, the treads, and sometimes the post anchors.

Custom interior staircase and its guard, designed, built and installed by Escaliers Messier

A railing drawn, built and installed by the same team.

01
We measure at your place

We take the dimensions from the nose of the tread, regulated height included, and we note what can stay in place. Nothing is drawn before that visit.

02
Drawing and quote

You get a dimensioned drawing and a firm price: infill, handrail, fixings. Nothing is cut until you approve it.

03
Built in our shop

Everything is made in Granby, in our own shop. Count six to eight weeks between the approved drawing and the install. We check the dimensions a second time once the parts are laid out.

04
Installation and finish

Our own crew installs it, in one to three days. No subcontractor: the same people from start to finish.

In Chambly, the railing ages faster than the staircase.

In a house built after 1990 the staircase is usually sound: the stringer does not work, the treads hold, nothing creaks underfoot. What has aged badly is the barrier put up as part of the original build — catalogue turned posts, a thin grip, a stain gone yellow. So we get called for a new railing on a flight nobody intends to take out, and that is the least expensive scenario we handle. The site visit is then there to confirm what stays. The Granby shop covers Chambly and the whole of Montérégie.

  • The flight is kept whenever the stringer and the treads allow it
  • The existing barrier height is measured, never taken from the builder’s plan
  • Post anchors are probed into the framing before anything is drawn
Straight flight edged with white wood balusters under a dark handrail
WHAT YOU GET

What is included, and what drives the price

A custom railing comes down to three or four decisions, not more. Here they are, so you know what to expect before you even call us.

Included in every project
  • The site measurement, at your home
  • The dimensioned drawing and your approval
  • Manufacturing in our own shop in Granby
  • Installation and finishing by our own crew
What pushes the price up
  • The total length to cover: flight, landing, upper-floor opening
  • The infill: turned wood, steel balusters, tempered glass
  • The number of sections and corners
  • A curved handrail rather than a straight one
What brings it down
  • Keeping the existing posts and fixings
  • Replacing the handrail only
  • Choosing a standard infill rather than glass
  • Doing the flight and the landing in one visit

Tell us what you have at home and we will tell you what it costs. The form is right below.

QUOTE REQUEST

What we look at first in your photographs

Give us the address and, if you know it, the year the house went up. In Chambly that alone places the likely height of the barrier you have now and the way the posts were fixed at the outset.

Then tell us whether the flight is staying and whether the barrier also runs along an upstairs landing. The site measurement comes afterwards, and the team that builds it is the team that fits it.

Frame the whole railing, then move in on the foot of one post where it meets the floor.
Only your name and email are required. We reply within 24 to 48 business hours.

TURNKEY SERVICE

From the first measurement to the last tread, one team.

We subcontract neither the manufacturing nor the installation. The same team measures, mills and installs — and that is what allows us to correct on site the discrepancies no drawing ever anticipates.

Custom staircase design work at the Escaliers Messier workshop

Design

We measure the opening at your home, set out the rise and run, and settle the wood species and the railing. The project is fixed before a single piece is cut.

Hardwood staircase being built at the Escaliers Messier workshop

Manufacturing

Milled at the workshop, in hardwood. Every staircase is built for its own opening: nothing is assembled in series or pulled from stock.

Custom interior staircase being installed on Montreal's South Shore

Installation

Installed by our own team, in one to three days. Adjustments are made on site, against the real opening rather than the drawing.

Sanding a hardwood staircase during a restoration at the Escaliers Messier workshop

Restoration

Straight, winder or spiral, classic or modern — measured at your home, milled at the workshop, installed by our team.

PROJECTS

A few of our projects

Three installations documented step by step. Each entry shows the infill chosen, how the anchorage was taken back under the floor and the way the grip meets the landing.

VIEW ALL OUR PROJECTS →
THE OTHER JOB

And if the flight itself needs rebuilding?

Around the basin and the old core there remain houses from before 1970 where the flight is exactly as old as the barrier. Those addresses make up only a small share of the Chambly stock, but they are best handled in one go.

CUSTOM STAIRCASES IN CHAMBLY →

Frequently asked questions

My original railing dates from 1996. Does it have to be brought up to standard?
As long as it is left alone, work that met the requirements of the day it went in is generally still accepted; taking it off is what forces the upgrade. On housing from the 1990s the commonest shortfall is not the height but the spacing between balusters, which has been tightened since. We measure both on site and tell you where you stand.
Can the posts stay and only the balusters change?
Often yes in a recent house, where the posts are square and the timber has not moved. We still probe the anchorage, because a new infill does not cure a post that moves. Where the original fixing bit into the sheathing only, we take it back from below and the posts themselves stay put.
Does glass suit a house from the 1990s?
That is where it changes the room most. These open plans were drawn for the light, which a file of white balusters chops up over the full height of the stairwell; glass lets it through end to end. We put both options into a drawing before you decide, because the difference is hard to judge from a description.
How long between sign-off and installation?
Six to eight weeks. The parts made for your job set that pace — glass cut to size, hardware, machined balusters — far more than the length to be covered. Allow one to three days on site afterwards for the fitting.
Should the upstairs landing be done at the same time?
It is nearly always the better course. On the open plans of the past twenty-five years the landing guard sits on the same line as the one along the flight and is taken in at a glance from the ground floor. Redoing only one half leaves a visible junction. We price the two lengths separately so the decision stays yours.
WE ALSO SERVE
ONE TEAM, FROM MEASUREMENT TO INSTALLATION

The staircase you have in mind, down to the millimetre.

Tell us about the room, the height to climb and how the space is used. We will tell you which layouts are possible in your home, and what each one involves.

REQUEST A QUOTE →