Staircase in birch custom manufactured and installed by Escaliers Messier
CONTRACTORS

custom staircases for contractors

You build. We deliver a flawless staircase, without complications.
One partner for surveying, design, manufacture and installation.

Survey · workshop drawings · manufacture · finishing · installation

15+
YEARS OF EXPERIENCE
100+
COMPLETED PROJECTS
100%
MADE IN QUEBEC
6–8 weeks
TYPICAL LEAD TIME

One less post to monitor on your schedule


The person who takes the measurements follows the production and answers when you call from the site.The workshop drawings are given to you, usable as is by the architect and inspection.

  • One contact, from survey to installation
  • Statement taken at the time agreed with you
  • Finishing in the workshop, including hidden faces
  • No minimum or maximum volume: unit, twins, blocks
Residential construction site: two workers at the foot of a staircase under assembly

We align with your sequence, not the other way around

The only technical constraint: the number of treads depends on the finished height, so the closer the floor is to its final state, the less adjustments are left to be made when laying.

It takes six to eight weeks after the survey, then one to three days of installation, depending on the layout. If the site slips, we reschedule.On projects with several units, nothing changes: same team, same survey cage by cage.

Handshake over a construction plan placed on a construction site desk
WHAT THEY SAY
« We have worked with Messier for eight years on our high-end residential projects. Reliable, precise and always on time. »
Jean-Sébastien D.
General Contractor · Brossard
WHY CHOOSE ESCALIERS MESSIER

A Staircase Layout Is Decided in Your Home, Not from a Catalogue.

The floor-to-floor height, stairwell opening and available floor clearance determine the layout far more than personal taste. We record these three measurements before proposing any option.

Custom Staircases for Contractors — Escaliers Messier

Site Measurement Before Design

Measurements are taken in your home at the actual stair opening. The possible layout follows from them, never the other way around.

Custom Staircases for Contractors — Escaliers Messier

Rise Calculated to the Millimetre

Riser height and tread depth are governed by the Quebec Construction Code. The number of treads is not negotiable.

Custom Staircases for Contractors — Escaliers Messier

Finished in Our Workshop

Treads and stringers are sealed before installation, including hidden faces. A job site is not a finishing workshop.

Custom Staircases for Contractors — Escaliers Messier

One Team

The same team measures the opening, builds the staircase and installs it. No subcontractor steps in between the drawing and the final screw.

Every layout has its own clearance requirements: explore all our staircase types, or our projects to compare them in real stair openings.

PROJECTS

What comes out of the workshop

The layout, essence, structure and railing are documented on each sheet, which is the level of detail that a project manager can transmit to his client as it is.

See all our Projects.

FREQUENTLY ASKED QUESTIONS

What entrepreneurs ask of us.

At what point in the construction site do you take the measurement?

The only technical constraint is that the number of treads and the layout depend on the finished height, so the closer the floor is to its final state, the less adjustments are left to be made at the time of installation. From there, we align with your sequence.

Who is my contact person from start to finish?

One person. The one who lifts the cage follows the manufacturing and answers when you call from the site. There is no file transfer between sales, workshop and installation team, because it is not a different company at each stage. Our Workshop.

Do you provide drawings that can be used by the architect or inspector?

Yes, the workshop drawings are provided before the construction and can be used as they are for the architect’s approval and for inspection. The climb is measured according to the requirements of the Quebec Building Code.

Is the finishing done on my site?

No, in the workshop, including hidden faces. This is what avoids you inserting drying days in the calendar and coordinating our passage with that of the painter.The staircase arrives finished and assembled for its cage. See our stairs in hardwood.

My construction site has been delayed by three weeks. What is happening?

The staircase remains in the workshop, finished, until the building is ready to receive it. You do not have to find a dry and protected place to store it on site, and you can use the staircase as a storage space for your stairs.

Can the price change after the order?

No, it is firm based on approved plans.A change requested along the way is costed in writing and approved before execution—never discovered at billing.

Is there a minimum or maximum volume?

Neither one nor the other. A unit as a project with several units: condos, semi-detached, blocks. The way of working does not change, each cage is raised for itself. staircase types.

See also our Railings and Handrails, but Projects, or request a quote.

ONE TEAM, FROM MEASUREMENT TO INSTALLATION

The Staircase You Imagine, Down to the Millimetre.

Tell us about the room, the floor-to-floor height and its intended use. We will explain which layouts fit your space and what each option involves.

REQUEST MY QUOTE →