MONTÉRÉGIE · MRC DE LA VALLÉE-DU-RICHELIEU

Stair railings and guards in Carignan

In an open house the guard around the void is often the only upright element in the middle of the floor: it is read from the kitchen as much as from the treads. We build these interior guards in hardwood, metal or tempered glass, and we draw them so that they have no back.

Measured, milled at our workshop, installed and finished by our own team

6–8 wks
TYPICAL LEAD TIME
4
INFILL OPTIONS
3
REGULATED VALUES
100%
MADE IN QUÉBEC
OUR RAILINGS AND GUARDS

Five railing families. One that fits your stairs.

In an open house the barrier around the opening is often the only vertical thing standing in the middle of the floor. You see it from the kitchen as much as from the stairs. Here are the five ways to change it, all set out under our railings and guards.

METHOD

How it works, from the site visit to the install

With no hidden side, nothing gets tidied up from behind: the site visit also decides where the fixings will run.

Custom interior staircase and its guard, designed, built and installed by Escaliers Messier

A railing drawn, built and installed by the same team.

01
We measure at your place

We take the dimensions from the nose of the tread, regulated height included, and we note what can stay in place. Nothing is drawn before that visit.

02
Drawing and quote

You get a dimensioned drawing and a firm price: infill, handrail, fixings. Nothing is cut until you approve it.

03
Built in our shop

Everything is made in Granby, in our own shop. Count six to eight weeks between the approved drawing and the install. We check the dimensions a second time once the parts are laid out.

04
Installation and finish

Our own crew installs it, in one to three days. No subcontractor: the same people from start to finish.

In Carignan, the guard is seen from both sides. So it is finished on both sides.

On wide lots the plan opens up: kitchen, dining room and stairs share one volume. The barrier around the opening ends up in the middle of that volume rather than against a wall. You see it head-on going up, from behind at the table, at an angle from the front door. In practice, no joint can be tidied up on the hidden side — there is none — and the hardware is chosen to be looked at rather than hidden. The newels themselves are anchored into the floor structure, not into the covering alone. We build in Granby for the whole of Montérégie.

  • Joints are finished on both faces, since there is no hidden side
  • Newels are anchored into the structure, not into the floor covering
  • The grip is returned at both ends, never left cut off
Glass guard edging a central-stringer flight in an open room
WHAT YOU GET

What is included, and what drives the price

A custom railing comes down to three or four decisions, not more. Here they are, so you know what to expect before you even call us.

Included in every project
  • The site measurement, at your home
  • The dimensioned drawing and your approval
  • Manufacturing in our own shop in Granby
  • Installation and finishing by our own crew
What pushes the price up
  • The total length to cover: flight, landing, upper-floor opening
  • The infill: turned wood, steel balusters, tempered glass
  • The number of sections and corners
  • A curved handrail rather than a straight one
What brings it down
  • Keeping the existing posts and fixings
  • Replacing the handrail only
  • Choosing a standard infill rather than glass
  • Doing the flight and the landing in one visit

Tell us what you have at home and we will tell you what it costs. The form is right below.

QUOTE REQUEST

Tell us what sits behind the guard

The length to cover matters, but what lies on the other side matters just as much. An assembly ringing an opening in the middle of the living area is not handled like one that follows a partition: it will be seen from behind as often as from the front.

Give us the floor concerned and the rough age of the structure as well, since that is what tells us how the posts can be anchored. We come out to measure after that, and whoever takes the dimensions is the one who installs the piece.

Take it from both sides: one from the stairs, one from the room.
Only your name and email are required. We reply within 24 to 48 business hours.

TURNKEY SERVICE

From the first measurement to the last tread, one team.

We subcontract neither the manufacturing nor the installation. The same team measures, mills and installs — and that is what allows us to correct on site the discrepancies no drawing ever anticipates.

Custom staircase design work at the Escaliers Messier workshop

Design

We measure the opening at your home, set out the rise and run, and settle the wood species and the railing. The project is fixed before a single piece is cut.

Hardwood staircase being built at the Escaliers Messier workshop

Manufacturing

Milled at the workshop, in hardwood. Every staircase is built for its own opening: nothing is assembled in series or pulled from stock.

Custom interior staircase being installed on Montreal's South Shore

Installation

Installed by our own team, in one to three days. Adjustments are made on site, against the real opening rather than the drawing.

Sanding a hardwood staircase during a restoration at the Escaliers Messier workshop

Restoration

Straight, winder or spiral, classic or modern — measured at your home, milled at the workshop, installed by our team.

PROJECTS

A few of our projects

Three guard installations followed by one crew, from the measuring visit to the final adjustment. Each entry shows the infill chosen, how the posts were anchored and the way the grip was joined.

VIEW ALL OUR PROJECTS →
THE OTHER JOB

And if the flight itself needs rebuilding?

A new guard fitted beside tired treads points up the contrast instead of softening it. In an open plan, where the whole thing is taken in at a glance, the two are better settled together.

CUSTOM STAIRCASES IN CARIGNAN →

Frequently asked questions

Can posts be fixed anywhere other than into a wall?
That is the normal situation as soon as an opening gives onto a room. The post is then taken into the floor structure: a joist, a block added between two joists, or a plate bolted under the covering. What counts is knowing where the timber runs before drilling, not after. We locate it at the measuring visit, lifting a board or probing from below where access allows.
Does a glass infill suit a spot beside a kitchen?
Yes, bearing in mind that it needs cleaning more often than elsewhere in the house: cooking leaves a fine film that raking light picks out immediately. Lightly tinted glass hides it better than perfectly clear glass. On durability there is nothing to report — neither the heat nor the humidity of a domestic kitchen affects tempered glass.
Can the guard carry a shelf or a bench?
It comes up in open plans, where the assembly runs alongside a dining area. Nothing rules it out so long as the fixing does not bite into the grip and the whole still takes the required thrust. We then draw it as a single piece, with the shelf carried by the posts rather than screwed to the handrail.
What lead time should we allow?
Allow six to eight weeks from the approved drawing to the fitting day. The made-to-order items — glass, hardware, machined parts — set that pace far more than the length to be covered. Fitting itself is a matter of days.
What if the opening was cut too large?
It happens in houses handed over without a permanent guard: the opening was cut generously to let site equipment through. The fix is to bring the line back inside the void, with a floor return or a bracket. We measure the difference on site, then propose the least visible correction.
WE ALSO SERVE
ONE TEAM, FROM MEASUREMENT TO INSTALLATION

The staircase you have in mind, down to the millimetre.

Tell us about the room, the height to climb and how the space is used. We will tell you which layouts are possible in your home, and what each one involves.

REQUEST A QUOTE →