MONTÉRÉGIE · MRC DE LA VALLÉE-DU-RICHELIEU

Custom staircases in Mont-Saint-Hilaire

The ground rules here. A sloping lot breaks a house into offset platforms, and the run has to pick up every one of them. We mill the interior hardwood staircase that does that work, from the garage set low into the hill up to the mezzanine that looks out at the mountain.

Measured, milled at our workshop, installed and finished by our own team

15+
YEARS OF EXPERIENCE
100+
PROJECTS COMPLETED
100%
MADE IN QUÉBEC
6–8 wks
TYPICAL LEAD TIME
OUR STAIRCASES

Eight staircase families. One that fits your home.

On a sloping lot the house breaks into staggered levels: the stairs link four or five floors, not two. Not every layout works in that setup. These are the eight models we build in our own shop, each available in a classic or a contemporary style, and all shown under our staircases.

METHOD

How it works, from the site visit to the install

Here every change of level is measured on its own. A flight built to a template gives itself away by the third step.

Custom interior staircase and its guard, designed, built and installed by Escaliers Messier

A staircase drawn, built and installed by the same team.

01
We measure at your place

Finished floor to finished floor, the run available on the floor, the width of the opening. Nothing is drawn before that visit.

02
Drawing and quote

You get a dimensioned drawing and a firm price: layout, wood species, stain, railing infill. Nothing is cut until you approve it.

03
Built in our shop

Everything is made in Granby, in our own shop. Count six to eight weeks between the approved drawing and the install. We check the dimensions a second time once the stringers are laid out.

04
Installation and finish

Our own crew installs it, in one to three days. No subcontractor: the same people from start to finish.

In Mont-Saint-Hilaire, the ground slopes and the house breaks into levels.

On the roads climbing toward the mountain, few houses sit flat. The builder followed the slope: garage below, living room half a level up, bedrooms higher again. So your stairs link four or five floors, and every gap has its own height. That is why a stock staircase never fits here — it gives itself away by the third step. We measure each change of level separately, and it is that survey, not a preference, that decides whether the run goes up in one piece or breaks. The Granby shop delivers throughout Montérégie.

  • Every half-level is measured on its own, never inferred from the last
  • One continuous run or a broken one, whichever the slope dictates
  • Installation is set to the real finished floor, not the level on the plan
Hardwood flight linking two half-levels in a house built on a slope
WHAT YOU GET

What is included, and what drives the price

A custom staircase comes down to four or five decisions, not more. Here they are, so you know what to expect before you even call us.

Included in every project
  • The site measurement, at your home
  • The dimensioned drawing and your approval
  • Manufacturing in our own shop in Granby
  • Installation and finishing by our own crew
What pushes the price up
  • The layout: straight, winder, spiral
  • The number of treads and the height to climb
  • The wood species and the stain
  • The railing infill: wood, metal, glass
  • Moving the floor opening
What brings it down
  • Keeping the existing stringers and anchors
  • Reusing the opening exactly as it is
  • Choosing a common wood species
  • Doing the staircase and the railing together

Tell us what you have at home and we will tell you what it costs. The form is right below.

QUOTE REQUEST

Give us the height of every half-level

A house built in stages is poorly described by a single measurement. Work upward instead, noting the height that separates each finished floor from the one above. That tells us straight away whether the run will need to break.

Attach two images: one taken from the highest landing, one from the foot of the void. The site measurement follows, carried out by the crew that will build the flight.

Stand back far enough to catch the start, the top and the wall running alongside.
Only your name and email are required. We reply within 24 to 48 business hours.

TURNKEY SERVICE

From the first measurement to the last tread, one team.

We subcontract neither the manufacturing nor the installation. The same team measures, mills and installs — and that is what allows us to correct on site the discrepancies no drawing ever anticipates.

Custom staircase design work at the Escaliers Messier workshop

Design

We measure the opening at your home, set out the rise and run, and settle the wood species and the railing. The project is fixed before a single piece is cut.

Hardwood staircase being built at the Escaliers Messier workshop

Manufacturing

Milled at the workshop, in hardwood. Every staircase is built for its own opening: nothing is assembled in series or pulled from stock.

Custom interior staircase being installed on Montreal's South Shore

Installation

Installed by our own team, in one to three days. Adjustments are made on site, against the real opening rather than the drawing.

Sanding a hardwood staircase during a restoration at the Escaliers Messier workshop

Restoration

Straight, winder or spiral, classic or modern — measured at your home, milled at the workshop, installed by our team.

PROJECTS

A few of our projects

Three documented projects, from the initial measurement through to the final coat. Each entry records the species chosen, the stringer type and the tone that came out of it.

VIEW ALL OUR PROJECTS →
THE OTHER JOB

Is it the railing rather than the stairs?

Where the flight dates from the build and still carries perfectly well, the guard around the void is what shows its age first. On an open mezzanine that replacement happens without touching a single tread.

STAIR RAILINGS IN MONT-SAINT-HILAIRE →

Frequently asked questions

The house is on half-levels — does each landing need its own flight?
Not necessarily, but it has to be settled at the site measurement rather than afterwards. Two short sections split by a landing often walk better than one long run absorbing everything at once, particularly where the offset exceeds an ordinary storey. What matters is that risers stay even within each section: walking comfort decides, not the number of flights.
Does an open run over the living area lose heat upstairs?
An open void does carry warm air upward, and it shows more in a volume climbing through three levels. The staircase is not what solves this — ventilation and the placement of supply outlets are. We simply raise it early enough for your contractor to allow for it before the ceilings close.
Which species holds up best against a large glazed wall?
Every species reacts to direct light, though not at the same pace: pale timbers darken, rich stains lighten. Facing a south-facing opening we suggest a lightly pigmented finish over an outright stain, and we bring samples with us, so the comparison happens in the real light of the room.
How long from approval of the drawing to installation?
Six to eight weeks. That window covers shaping and then coating at the workshop, and the fitting day is reserved as soon as the pieces are released. The site measurement happens beforehand, by appointment, and sits outside that period.
Do you work with builders on sloping lots?
Regularly, and it is the best moment to be involved. Fixing the layout before the finished floors go down avoids correcting an offset once the structure is closed. We hand the crew the opening and clearance dimensions they need, then fit into their site schedule.
WE ALSO SERVE
ONE TEAM, FROM MEASUREMENT TO INSTALLATION

The staircase you have in mind, down to the millimetre.

Tell us about the room, the height to climb and how the space is used. We will tell you which layouts are possible in your home, and what each one involves.

REQUEST A QUOTE →