SOUTH SHORE · AGGLOMÉRATION DE LONGUEUIL

Stair railings and guards in Saint-Hubert

We replace the interior stair railings and guards of Saint-Hubert homes, in hardwood, steel or glass. The light ornamental ironwork of the post-war bungalow has aged as one piece: it runs down to the basement without a break and is held at two or three points.

Measured, milled at our workshop, installed and finished by our own team

6–8 wks
TYPICAL LEAD TIME
4
INFILL OPTIONS
3
REGULATED VALUES
100%
MADE IN QUÉBEC
OUR RAILINGS AND GUARDS

Five railing families. One that fits your stairs.

The ornamental ironwork in post-war bungalows has aged as one piece: it runs down to the basement without a break, and it never had a single post. Here are the five ways to change it, all set out under our railings and guards.

METHOD

How it works, from the site visit to the install

Here the site visit starts with one simple question: what is the assembly screwed into? The answer decides everything else.

Custom interior staircase and its guard, designed, built and installed by Escaliers Messier

A railing drawn, built and installed by the same team.

01
We measure at your place

We take the dimensions from the nose of the tread, regulated height included, and we note what can stay in place. Nothing is drawn before that visit.

02
Drawing and quote

You get a dimensioned drawing and a firm price: infill, handrail, fixings. Nothing is cut until you approve it.

03
Built in our shop

Everything is made in Granby, in our own shop. Count six to eight weeks between the approved drawing and the install. We check the dimensions a second time once the parts are laid out.

04
Installation and finish

Our own crew installs it, in one to three days. No subcontractor: the same people from start to finish.

In Saint-Hubert, the railing is screwed into drywall. That is the problem.

The bungalows and cottages built here between 1960 and 1980 nearly all carry the same assembly: light ornamental ironwork, made in one piece from the top of the stairs down to the basement. It rests on no post at all. It is screwed to the wall at two or three points, often into the board alone, and decades of paint have drowned the welds. This is not a question of looks: an assembly held by three screws in drywall will not stop anyone. We take the whole thing down, refix into a framing member, then put back a guard at the height required today. Milled in Granby, fitted across the South Shore.

  • The whole assembly comes down without damaging the wall finish
  • Fixings are taken back into the stud or the stringer, never the board alone
  • Height is restored over the full run, from the top step to the bottom landing
Tempered glass guard running alongside an interior hardwood flight
WHAT YOU GET

What is included, and what drives the price

A custom railing comes down to three or four decisions, not more. Here they are, so you know what to expect before you even call us.

Included in every project
  • The site measurement, at your home
  • The dimensioned drawing and your approval
  • Manufacturing in our own shop in Granby
  • Installation and finishing by our own crew
What pushes the price up
  • The total length to cover: flight, landing, upper-floor opening
  • The infill: turned wood, steel balusters, tempered glass
  • The number of sections and corners
  • A curved handrail rather than a straight one
What brings it down
  • Keeping the existing posts and fixings
  • Replacing the handrail only
  • Choosing a standard infill rather than glass
  • Doing the flight and the landing in one visit

Tell us what you have at home and we will tell you what it costs. The form is right below.

QUOTE REQUEST

Tell us what the railing is fixed to

Two details frame the job: the present height, taken from the floor to the top of the handrail, and what the assembly meets — a wall, a newel, or both.

Push the railing with your hand before writing to us, and note where it gives: mid-descent, or close to a fixing. That one detail separates a re-anchoring from a full replacement.

One straight-on view from the bottom, plus one of the newel base, is enough for a first opinion.
Only your name and email are required. We reply within 24 to 48 business hours.

TURNKEY SERVICE

From the first measurement to the last tread, one team.

We subcontract neither the manufacturing nor the installation. The same team measures, mills and installs — and that is what allows us to correct on site the discrepancies no drawing ever anticipates.

Custom staircase design work at the Escaliers Messier workshop

Design

We measure the opening at your home, set out the rise and run, and settle the wood species and the railing. The project is fixed before a single piece is cut.

Hardwood staircase being built at the Escaliers Messier workshop

Manufacturing

Milled at the workshop, in hardwood. Every staircase is built for its own opening: nothing is assembled in series or pulled from stock.

Custom interior staircase being installed on Montreal's South Shore

Installation

Installed by our own team, in one to three days. Adjustments are made on site, against the real opening rather than the drawing.

Sanding a hardwood staircase during a restoration at the Escaliers Messier workshop

Restoration

Straight, winder or spiral, classic or modern — measured at your home, milled at the workshop, installed by our team.

PROJECTS

A few of our projects

A few assemblies of the same order, drawn and milled at the workshop before being fitted on site. Each entry states the infill material and the finish.

VIEW ALL OUR PROJECTS →
THE OTHER JOB

And if the flight itself needs rebuilding?

Treads hollowed in the middle, split risers, a stringer that creaks at every step: a new railing will not redeem a flight that far gone.

CUSTOM STAIRCASES IN SAINT-HUBERT →

Frequently asked questions

The railing is screwed into plasterboard — does the wall have to be opened?
Rarely. We first locate the stud behind the board and move the fixing points to land on it. Where no framing sits anywhere useful, a small opening is enough to fit a backing piece: it is closed up and made good before we leave.
Can the original ironwork be raised instead of replaced?
Not on a run welded in one piece. Extending the uprights throws the geometry out and leaves the period welds working in cantilever. On this type of railing, meeting the height now required means a new assembly, drawn from a fresh measurement of the descent.
Does modern metalwork look like period ornamental iron?
The drawing itself carries over easily: scrolls, base plates, a flat handrail. What changes is the section and the spacing between pickets, tighter now than it was then. From across the room the effect is the original one; up close, the assembly reads denser.
How long is the descent left without a railing?
Everything that can be made in advance is made in advance. On a straight descent, removal and installation fit into the same visit; where the assembly also borders a landing, allow one to three days, and the stairs stay usable throughout.
Do you rebuild the porch railing as well?
No. We work indoors only: railings, guards and handrails for interior stairs. A balcony or exterior stair guard answers to different demands of material and exposure, and belongs to another trade.
WE ALSO SERVE
ONE TEAM, FROM MEASUREMENT TO INSTALLATION

The staircase you have in mind, down to the millimetre.

Tell us about the room, the height to climb and how the space is used. We will tell you which layouts are possible in your home, and what each one involves.

REQUEST A QUOTE →