Stair railings and guards in Saint-Bruno-de-Montarville
Hardwood, metal or tempered glass: we rebuild the interior guards of Saint-Bruno-de-Montarville homes. In a half-level house the original newel is still holding — what has aged is everything running between it and the living room.
Measured, milled at our workshop, installed and finished by our own team
Five railing families. One that fits your stairs.
In a split-level the original newel is still holding. What has aged is everything running between it and the living room. Here are the five ways to change it, all set out under our railings and guards.

Handrail
Changing the handrail alone: the smallest budget for a real difference.

Custom guard
Same height, same code compliance, but a design you chose rather than inherited.

Glass railing
The most light, and the most dramatic change of the five.

Metal railing
Slim steel balusters, matte black. The contemporary look people ask for most.

Railings and handrails
All four families together, to compare before you decide.
How it works, from the site visit to the install
Here the site visit starts at the anchor: we test the newel before anyone talks about infill.

A railing drawn, built and installed by the same team.
We take the dimensions from the nose of the tread, regulated height included, and we note what can stay in place. Nothing is drawn before that visit.
You get a dimensioned drawing and a firm price: infill, handrail, fixings. Nothing is cut until you approve it.
Everything is made in Granby, in our own shop. Count six to eight weeks between the approved drawing and the install. We check the dimensions a second time once the parts are laid out.
Our own crew installs it, in one to three days. No subcontractor: the same people from start to finish.
In Saint-Bruno, we keep the newels and redo everything between them.
The split-level has something the bungalow does not: a long open run bordering the raised living room, often three or four metres of it, plus a second run where the stairs start. The newels in these houses are heavy and anchored into the framing; fifty years on, they still do not move. What has aged is the infill — thin balusters, widely spaced, fitted when the allowed gap was not the one in force today. So we test the anchor, confirm it still carries the load, then rebuild the full run between the newels we keep, and you are not paying for two new posts. Everything leaves the Granby shop, for Saint-Bruno and for the rest of the South Shore.
- The newel anchor is tested before any decision on the infill
- The long run is rebuilt in one piece, with no visible joint
- Baluster spacing is brought back to the figure allowed today

What is included, and what drives the price
A custom railing comes down to three or four decisions, not more. Here they are, so you know what to expect before you even call us.
- The site measurement, at your home
- The dimensioned drawing and your approval
- Manufacturing in our own shop in Granby
- Installation and finishing by our own crew
- The total length to cover: flight, landing, upper-floor opening
- The infill: turned wood, steel balusters, tempered glass
- The number of sections and corners
- A curved handrail rather than a straight one
- Keeping the existing posts and fixings
- Replacing the handrail only
- Choosing a standard infill rather than glass
- Doing the flight and the landing in one visit
Tell us what you have at home and we will tell you what it costs. The form is right below.
Measure two things and we will take it from there
The height of the handrail above the floor, and the total length of the span: those two numbers, even roughly, already tell us whether this is a rebuild between newels or a complete assembly.
A photograph taken square on, at eye level, beats any description. Add one of a newel base if something gives.
From the first measurement to the last tread, one team.
We subcontract neither the manufacturing nor the installation. The same team measures, mills and installs — and that is what allows us to correct on site the discrepancies no drawing ever anticipates.

Design
We measure the opening at your home, set out the rise and run, and settle the wood species and the railing. The project is fixed before a single piece is cut.

Manufacturing
Milled at the workshop, in hardwood. Every staircase is built for its own opening: nothing is assembled in series or pulled from stock.

Installation
Installed by our own team, in one to three days. Adjustments are made on site, against the real opening rather than the drawing.

Restoration
Straight, winder or spiral, classic or modern — measured at your home, milled at the workshop, installed by our team.
A few of our projects
Assemblies of this kind, built at the workshop and fitted by our crew. Each entry gives the infill chosen and the finish applied.
And if the flight itself needs rebuilding?
With the varnish gone and the treads hollowed to bare wood, replacing only the guard underlines the wear instead of correcting it.
