SOUTH SHORE · AGGLOMÉRATION DE LONGUEUIL

Stair railings and guards in Saint-Bruno-de-Montarville

Hardwood, metal or tempered glass: we rebuild the interior guards of Saint-Bruno-de-Montarville homes. In a half-level house the original newel is still holding — what has aged is everything running between it and the living room.

Measured, milled at our workshop, installed and finished by our own team

6–8 wks
TYPICAL LEAD TIME
4
INFILL OPTIONS
3
REGULATED VALUES
100%
MADE IN QUÉBEC
OUR RAILINGS AND GUARDS

Five railing families. One that fits your stairs.

In a split-level the original newel is still holding. What has aged is everything running between it and the living room. Here are the five ways to change it, all set out under our railings and guards.

METHOD

How it works, from the site visit to the install

Here the site visit starts at the anchor: we test the newel before anyone talks about infill.

Custom interior staircase and its guard, designed, built and installed by Escaliers Messier

A railing drawn, built and installed by the same team.

01
We measure at your place

We take the dimensions from the nose of the tread, regulated height included, and we note what can stay in place. Nothing is drawn before that visit.

02
Drawing and quote

You get a dimensioned drawing and a firm price: infill, handrail, fixings. Nothing is cut until you approve it.

03
Built in our shop

Everything is made in Granby, in our own shop. Count six to eight weeks between the approved drawing and the install. We check the dimensions a second time once the parts are laid out.

04
Installation and finish

Our own crew installs it, in one to three days. No subcontractor: the same people from start to finish.

In Saint-Bruno, we keep the newels and redo everything between them.

The split-level has something the bungalow does not: a long open run bordering the raised living room, often three or four metres of it, plus a second run where the stairs start. The newels in these houses are heavy and anchored into the framing; fifty years on, they still do not move. What has aged is the infill — thin balusters, widely spaced, fitted when the allowed gap was not the one in force today. So we test the anchor, confirm it still carries the load, then rebuild the full run between the newels we keep, and you are not paying for two new posts. Everything leaves the Granby shop, for Saint-Bruno and for the rest of the South Shore.

  • The newel anchor is tested before any decision on the infill
  • The long run is rebuilt in one piece, with no visible joint
  • Baluster spacing is brought back to the figure allowed today
Wood and metal guard bordering the raised living room of a split-level
WHAT YOU GET

What is included, and what drives the price

A custom railing comes down to three or four decisions, not more. Here they are, so you know what to expect before you even call us.

Included in every project
  • The site measurement, at your home
  • The dimensioned drawing and your approval
  • Manufacturing in our own shop in Granby
  • Installation and finishing by our own crew
What pushes the price up
  • The total length to cover: flight, landing, upper-floor opening
  • The infill: turned wood, steel balusters, tempered glass
  • The number of sections and corners
  • A curved handrail rather than a straight one
What brings it down
  • Keeping the existing posts and fixings
  • Replacing the handrail only
  • Choosing a standard infill rather than glass
  • Doing the flight and the landing in one visit

Tell us what you have at home and we will tell you what it costs. The form is right below.

QUOTE REQUEST

Measure two things and we will take it from there

The height of the handrail above the floor, and the total length of the span: those two numbers, even roughly, already tell us whether this is a rebuild between newels or a complete assembly.

A photograph taken square on, at eye level, beats any description. Add one of a newel base if something gives.

One straight-on view from the bottom, plus one of the newel base, is enough for a first opinion.
Only your name and email are required. We reply within 24 to 48 business hours.

TURNKEY SERVICE

From the first measurement to the last tread, one team.

We subcontract neither the manufacturing nor the installation. The same team measures, mills and installs — and that is what allows us to correct on site the discrepancies no drawing ever anticipates.

Custom staircase design work at the Escaliers Messier workshop

Design

We measure the opening at your home, set out the rise and run, and settle the wood species and the railing. The project is fixed before a single piece is cut.

Hardwood staircase being built at the Escaliers Messier workshop

Manufacturing

Milled at the workshop, in hardwood. Every staircase is built for its own opening: nothing is assembled in series or pulled from stock.

Custom interior staircase being installed on Montreal's South Shore

Installation

Installed by our own team, in one to three days. Adjustments are made on site, against the real opening rather than the drawing.

Sanding a hardwood staircase during a restoration at the Escaliers Messier workshop

Restoration

Straight, winder or spiral, classic or modern — measured at your home, milled at the workshop, installed by our team.

PROJECTS

A few of our projects

Assemblies of this kind, built at the workshop and fitted by our crew. Each entry gives the infill chosen and the finish applied.

VIEW ALL OUR PROJECTS →
THE OTHER JOB

And if the flight itself needs rebuilding?

With the varnish gone and the treads hollowed to bare wood, replacing only the guard underlines the wear instead of correcting it.

CUSTOM STAIRCASES IN SAINT-BRUNO-DE-MONTARCITY →

Frequently asked questions

Are the original newels always worth keeping?
Not invariably, but often. We probe the base: if it gives nothing and the fixing still bites into a structural member, the newel stays and only the infill changes. A newel that shifts under the hand comes out and gets re-anchored.
Can the height be raised without stripping everything out?
Yes, in most cases. We raise it by reworking the handrail and extending the newels we are keeping, or by fitting a taller infill. The floor and the finishes around it are left alone.
How many days for a long span?
One to three days on site in an ordinary residential setting — it depends on the span, how many newels come out, and how well the anchorings hold. Whatever can be made in advance is made in advance; on site we fit and finish.
Does glass work for the raised living room of a half-level?
That is where it earns its place: the span is long, it blocks the light reaching the lower level, and glass hands it back. A common compromise is to keep the wooden newels and handrail and put glass only in between.
What if the current installation is not compliant?
We report what we measure, without embroidering it. A height that falls short and a gap that is too wide between pickets are the two usual shortfalls in this housing stock, and both are corrected without opening the walls.
WE ALSO SERVE
ONE TEAM, FROM MEASUREMENT TO INSTALLATION

The staircase you have in mind, down to the millimetre.

Tell us about the room, the height to climb and how the space is used. We will tell you which layouts are possible in your home, and what each one involves.

REQUEST A QUOTE →