SOUTH SHORE

custom staircases in Longueuil

Escaliers Messier designs, manufactures and installs custom staircases in hardwood in Longueuil and surrounding areas.Our workshop in Estrie takes care of everything, from drawing to final installation.

CONTACT US →
QUOTE REQUEST
custom staircase in Longueuil
15+
YEARS OF EXPERIENCE
100+
PROJECTS COMPLETED
100%
MADE IN QUÉBEC
6–8 wks
TYPICAL LEAD TIME
OUR STAIRCASES

Eight staircase families. One that fits your home.

The staircase is rarely the first item in a renovation: it usually comes once the kitchen is done and the floor is down. That changes the installation far more than it changes the layout. These are the eight models we build in our own shop, each available in a classic or a contemporary style, and all shown under our staircases.

Straight hardwood staircase with a glass guard

Straight staircase

The most common layout. Simple, solid, and the least costly to build.

Winder staircase with radiating treads and a wood guard

Winder staircase

A quarter or a half turn, to save floor space without narrowing the treads.

Spiral staircase turning around a central post

Spiral staircase

When you need a way upstairs and there is very little floor to give.

Classic staircase with turned balusters and closed risers

Classic staircase

Closed risers and turned balusters. The warm, timeless choice.

Modern staircase with taut lines and an exposed stringer

Modern staircase

Exposed stringer and tempered glass. The change people notice first.

First treads of a Butcher Block staircase, hardwood strips glued on edge

Butcher Block

Thick hardwood treads glued on edge. The thickness is the whole point.

Central-stringer staircase in steel with a tempered glass railing

Central stringer

One steel beam down the middle, and treads that look like they float.

Luxury wooden staircase with wrought metalwork

Luxury staircase

Curves and wrought ironwork, for when the stair is the centrepiece.

METHOD

How it works, from the site visit to the install

Putting a staircase into a house already renovated means protecting what has only just been finished. The sequence does not change; the precautions do.

Custom interior staircase and its guard, designed, built and installed by Escaliers Messier

A staircase drawn, built and installed by the same team.

01
We measure at your place

Finished floor to finished floor, the run available on the floor, the width of the opening. Nothing is drawn before that visit.

02
Drawing and quote

You get a dimensioned drawing and a firm price: layout, wood species, stain, railing infill. Nothing is cut until you approve it.

03
Built in our shop

Everything is made in Granby, in our own shop. Count six to eight weeks between the approved drawing and the install. We check the dimensions a second time once the stringers are laid out.

04
Installation and finish

Our own crew installs it, in one to three days. No subcontractor: the same people from start to finish.

custom staircases in Longueuil, made in Montérégie

We manufacture and install interior stairs in hardwood in Longueuil and its boroughs. measured on site, Machining and finishing in the workshop, installation by the same team: it is the same path for a main staircase as for a basement flight, even if the constraints have nothing to do with it.

The distinction that structures the projects most is not the style but the use. A main staircase is visible from the entrance, it is used several times a day and it often commands the look of ground floor.A secondary staircase — a fitted basement, mezzanine, access to an office — meets other priorities, where the available space comes before the rest.

  • On-site survey, at the actual cage, before any drawing
  • Main staircase or secondary flight, same method of manufacture
  • hardwood Solid wood machined in the workshop, finish applied before installation
  • railing and handrail asked in the same intervention
landing, treads dark staircase and worked iron railing

A basement staircase does not count as a main staircase

The free height is almost always more appropriate, because a basement rarely offers the same clearance as a floor. This constraint goes back directly to the layout: a straight staircase requires a lot of ground length, while a quarter turn folds the fly and frees the passage at the foot of the climb.

The second point is the clearance at the finish, both at the top and at the bottom, you have to be able to stand and turn with an object in your hands. This is what we check first at the reading, before we even talk about wood species or railing, because this is what eliminates or validates possible paths.

A secondary staircase deserves the same hardwood and finish as the main staircase, it works less, but it ages in the same humidity conditions, and nothing is more visible than a secondary staircase that is obviously less well finished than the main one, especially when the two are seen from the same room.

Straight wing to wood treads and balusters fine metal
WHY CHOOSE ESCALIERS MESSIER

One Montérégie Workshop, One Team That Comes to You.

Built in our workshop and installed in your home by the same team. Distance does not change the promised schedule or how we work.

Custom Staircases in Longueuil | Escaliers Messier — Escaliers Messier

Installation in 1 to 3 Days

Installation takes one to three days depending on the layout. The staircase arrives machined and ready, not as parts to assemble on site.

Custom Staircases in Longueuil | Escaliers Messier — Escaliers Messier

Railing Installed at the Same Time

The railing and handrail are installed by the same team as part of the staircase installation.

Custom Staircases in Longueuil | Escaliers Messier — Escaliers Messier

Machined for Your Stair Opening

Every staircase is built for its own opening. Nothing is mass-assembled or pulled from stock.

Custom Staircases in Longueuil | Escaliers Messier — Escaliers Messier

Refinishing Is Possible

An existing hardwood staircase can be sanded and refinished on site without being completely removed.

We serve the South Shore and the Eastern Townships: view our projects or request a quote.

FREQUENTLY ASKED QUESTIONS

What we are asked to do in Longueuil.

Do you do basement stairs?

Yes, and this is a frequent request during a layout. The free height is often more accurate, the layout requires more attention than on the floor.We measure the height from floor to floor and the clearances at both ends before proposing anything. winder staircases.

Can a new staircase be matched to the existing floor?

We approach it very closely, rarely identical, because the floor has already aged and the new wood has not yet evolved. We work from a sample of a plank or a photo taken in daylight, then we adjust the hue on a sample before embarking on the flight. stairs in hardwood.

How long between order and installation?

The typical lead time is six to eight weeks. The most of this time is from the Machining and finishing in the workshop, not waiting: the staircase arrives assembled and finished. What happens at your home is then counted in days. We set the installation date once the manufacturing has begun.

Do you also manufacture the railing?

Yes, and we install it in the same intervention. The same measurement is used for both, since the height of the railing is measured from the stair nosing and therefore depends on the route. A railing ordered separately rarely reaches the right level. Railings and Handrails.

Do you work in the boroughs?

Yes, including Saint-Hubert and Greenfield Park, which are part of the city of Longueuil. The process is the same: survey on site, manufacture in the workshop, and delivery to the customer. stairs in Saint-Hubert.

Discover also all our staircase types, but Railings and Handrails and nos Projects, or request a quote.

ONE TEAM, FROM MEASUREMENT TO INSTALLATION

The Staircase You Imagine, Down to the Millimetre.

Tell us about the room, the floor-to-floor height and its intended use. We will explain which layouts fit your space and what each option involves.

REQUEST MY QUOTE →